One rate per part
A published rate card and a fixed quote per project. Booklets, molds, drawings and nesting are ticked on or off — and during the introduction every available option is included.
Work preparation · Shipbuilding
Tekwork turns your 3D model into a complete building package — cutting files, profiles, molds, booklets and lists. Prepared by engineers, checked before it ships, delivered numbered and certified.
One delivery, everything the floor needs. No option lists, nothing to tick, nothing forgotten.
| 01 | Plate cutting files | DXF per cutter template — contours, marking lines, part names, orientation, grid and waterline references. | CNC |
| 02 | Profile cutting list | The cutting plan for bar stock — every profile packed into your stock lengths, with cross-sections and end details. | Profiles |
| 03 | Molds & jigs | 2D and 3D molds for formed plates, MDF jig frames, mold lists with placement side. | Forming |
| 04 | Production booklets | Step-by-step assembly documents per building stage, with part balloons, weights and centres of gravity. | Floor |
| 05 | Part & purchase lists | Every plate and profile with its fabrication attributes, and what to order — plate stock and profile bars. | Ordering |
| 06 | Certificate & model | A completeness certificate with every delivery — what was checked, the counts, and what was excluded. | Proof |
3DM, DWG, STEP or IGES, with the basic design drawings. We confirm scope and return a fixed quote.
An engineer runs your project end-to-end: classification, markings, endings, molds, nesting, lists.
Open points come back as one numbered review sheet — each item with options and a stated default. No meetings, no software to learn.
The package arrives numbered and checked, with its certificate. Revisions come with a report of what changed.
A published rate card and a fixed quote per project. Booklets, molds, drawings and nesting are ticked on or off — and during the introduction every available option is included.
A person prepared and checked every file that ships. The certificate states what was checked and what was excluded.
Stock sizes, marking conventions, file structure, assembly steps — configured to your company, so nothing changes on the floor.
A model in, a certified package out. Start with one project and judge the work.